Investing today for the logistics of tomorrow
Terminal efficiency relies on the reliability, power, and versatility of its equipment. Designed for maximum safety and speed across all cargo types, our modern and constantly updated fleet handles every phase of loading, discharging, and yard maneuvering.
Assets & Equipment
Cranes and Heavy Lifting Equipment
4 STS (Ship-to-Shore Cranes)
Gantry crane for containers. Capacity 52 t at the ropes.
Manufacturer: Techint Technologies
Year: 2002
Portal gauge: 27 m
Total vertical spreader travel: 41 m
Supply voltage: 3000 V
2 RMG (Rail Mounted Gantry Cranes)
Gantry crane for containers. Nominal capacity 45 t at the ropes.
Manufacturer:
Ceretti Tanfani
Year:
1986
Portal gauge:
35 m
Total vertical spreader travel:
15 m
Supply voltage:
3000 V
Yard Handling Equipment
14 Reach Stackers
32 Forklift
Traction and Ro-Ro Equipment
18 Ro-Ro Tractors 4x4
4 Towing Tractors
23 Trailers
11 Roll trailers
Lifting and Safety Accessories
8 Spreaders for STS / RMG
5 Spreaders for Forklift
7 Overheight Frame
2 Safety Cage
Multiterminal Synergy
Strategic integration with the adjacent Terminal San Giorgio consolidates Messina’s leadership in the Port of Genoa, creating a single multipurpose gateway capable of serving every route with doubled power.
The 2027 Vision
The expansion project of Messina Terminal marks a fundamental step from the current configuration to a more capable and efficient structure.
The quay extension will enable multiple berth configurations and accommodate vessels of larger tonnage. The two ferry recesses will also allow two ferry vessels to dock simultaneously. This will increase the terminal’s overall operational capacity.
The future layout calls for significant growth in operational surface area. This development is not limited to space; it aims to optimise intermodality by strengthening the rail infrastructure, which will feature 6 fully operational tracks with lengths of up to 500 meters. Key benefits include increased storage capacity and improved quayside draught, which will reach 14.50 meters at the Ronco Pier and the Canepa head, allowing larger vessels to berth. The integration will be completed by restoring the direct rail link to Sampierdarena station, ensuring a faster and smoother logistics flow between sea and land.
LEGENDA
+325.000 sqm
Operational area
+4
Rail tracks
Operational capacity
+60
Linear meters of extension
Track length
Restoration
of direct rail link to Sampierdarena station
Logistics efficiency
+3,90 sqm
depth
Quay draught